Главная / Compliance

Before you import

EU type approval for electric mopeds and scooters: L1e, L3e and what importers must hold

In the EU an electric two-wheeler is registered by category, and the category is set by design speed and continuous rated power. L1e-B covers mopeds limited to 45 km/h; L3e covers motorcycles above that. Each category needs whole-vehicle type approval, and every unit needs a Certificate of Conformity. Approval is granted per vehicle type, not per factory, so a supplier's approval on one model tells you nothing about another. Separate obligations apply for batteries and WEEE, and these fall on the importer, not the Chinese factory.

Category decides everything else

CategoryTypical limitRegistration reality
L1e-APowered cycle, low power assistOften the lightest regulatory path, but the performance is too low for most of the models in this catalogue
L1e-BMoped, design speed up to 45 km/hThe mainstream route for 45 km/h scooters; rider licensing is lighter than for motorcycles
L3eMotorcycle, above 45 km/hFull motorcycle treatment: approval, plates, licence, usually insurance category change

The practical consequence is that the controller setting is a compliance decision, not a feature. A vehicle capable of 80 km/h that is limited to 45 km/h in software is not automatically an L1e-B — the category depends on the design of the vehicle as approved, and authorities do inspect this. Decide the category first, then specify the vehicle.

The document set

  • Whole-vehicle type approval for the specific vehicle type
  • A Certificate of Conformity issued per unit, which the registering authority will ask for
  • CE marking on components where the relevant directives apply
  • Battery regulation obligations, including producer registration in the member state
  • WEEE producer registration for electrical equipment placed on the market

Two obligations that are yours, not the factory's

Battery producer registration and WEEE registration attach to whoever places the product on the market in the member state — that is the importer. A Chinese factory cannot hold them for you, and a supplier who claims otherwise has misunderstood the rule. Register before the first container arrives, not after.

Trade defence duties: check before you price

The EU maintains anti-dumping and anti-subsidy measures on certain categories of two-wheeler originating in China, and the applicable rate can depend on the exporting company rather than on the product alone. Because the spread between rates is wide, this single line can decide whether a deal works. Ask your customs broker to confirm the duty position for the specific HS code and the specific exporter before you quote your own customer.

Does a supplier's approval on one model cover their other models?
No. Approval is granted per vehicle type. A factory with an approved 45 km/h model has demonstrated capability, which is worth something, but it does not transfer to a different frame, motor or battery configuration.
Can I import first and get approval afterwards?
No. Approval has to exist before the vehicles are placed on the market, and customs will hold goods that cannot be registered. A container waiting at port accrues demurrage while the approval process runs on its own timetable.
Who holds the approval certificate at the end?
This is negotiable and it matters commercially. If the factory holds it, you are tied to that factory for that model. If you fund the approval, put the holder in the contract before the testing starts.
Does the UK follow the same rules?
The UK operates a parallel scheme. An EU approval does not carry across automatically. If you serve both markets, confirm both routes rather than assuming one covers the other.

Last reviewed 2026-08 · MOPEDOEM · zzyum666@gmail.com

Ask about a specific model

Model plus market plus intended category. We answer in writing.

Ask a compliance question
WhatsApp